Crawford Cdm9 950 Installation Manual Top
Before mounting the hardware, clear the work area and gather necessary equipment.
Critical components for securing the operator to the door shaft. 2. Pre-Installation Requirements and Safety
Position the torque arm (anti-twist bracket) against the wall or frame structure. This arm absorbs the rotational force when the motor starts. crawford cdm9 950 installation manual top
If the motor has overheated, allow it to cool down to reset the protection switch.
Always ensure the power is disconnected before installing or servicing the operator to avoid electrical shock. 2. Assembling the Drive Unit Before mounting the hardware, clear the work area
For detailed technical diagrams and full terminal layouts, you can consult the official Crawford CDM9 950 Wiring Diagram or the ECS 950 Service Manual . ASSA ABLOY Electric Gates Installation Guide - 950 Manual
: Mount the torque bar to the mechanical unit. Place the rubber shock absorber between the torque bar and the mounting console to dampen vibrations. Height Requirement : The operator should be installed at a height of at least 2.5 meters above the floor for safety. Hurð ehf. ⚙️ Initial Programming & Setup Always ensure the power is disconnected before installing
The electronic unit containing the "C-card" that controls all functions, limits, and safety features.
For calibration purposes, use a tape measure to mark a "1-meter position" above the finished floor level on the door track or frame.
The drive unit is designed to be installed at a height of to keep it clear of pedestrian obstructions.
: Disengage the operator, manually move the door to 1.5 meters above the floor, and re-engage it.