Trakhees Coc 1 Form Exclusive Jun 2026

: Contractors must demonstrate basic consumption control metrics for water and electricity used during the mobilization phase. Step-by-Step Submission Process

In Dubai’s fast-paced construction landscape, ensuring your project adheres to the highest safety and regulatory standards is paramount. Trakhees, the regulatory arm of Ports, Customs, and Free Zone Corporation (PCFC), enforces strict compliance guidelines for projects within its jurisdictions (including areas like Jafza, Dubai South, and more). One of the most critical documents in the construction phase is the , commonly known as the Trakhees COC 1 Form .

First aid room with a certified male nurse and adequate fire extinguishers (DCD approved). trakhees coc 1 form exclusive

: The necessary documents, including architectural and structural plans, engineering designs, and other relevant approvals, must be submitted through the Trakhees system.

A Safety Advisor or Supervisor with a valid SARS/SSRS registration card must be on-site. One of the most critical documents in the

The Trakhees Building Regulations classify the Certificate of Conformity into distinct categories based on the risk level and complexity of the intended business activity.

Trakhees structural and EHS inspectors review the digital documentation. If compliant, they schedule an on-site physical inspection. The main contractor and consultant must be present on-site during this inspection to address any structural or safety queries raised by the inspector. Step 4: Snagging and Final Issuance A Safety Advisor or Supervisor with a valid

A high-density residential and retail development.

Trakhees structural and safety engineers review the submission. If anomalies are found, they issue a "BPM" (Building Permit Message) requesting clarifications. Once all queries are resolved, the exclusive COC 1 form is issued. Mandatory Documentation Checklist

The consultant gathers all architectural drawings, MEP (Mechanical, Electrical, Plumbing) plans, structural calculations, and material specifications. 3. Online Submission and Fee Payment

The COC 1 form includes a checklist of approximately 15 health and safety requirements and 4 green building requirements that must be confirmed ("Yes," "No," or "N/A"): Site Safety & Logistics: